File:East portal of the Central Tunnel retouched.jpg

原始檔案 (832 × 572 像素,檔案大小:184 KB,MIME 類型:image/jpeg


摘要

描述
English: View along the tracks looking towards the eastern portal of the Central Tunnel. The tunnel is a railway tunnel through the Central Range in Shizi Pingtung and Daren Taitung, and carries the South-Link Line under the Chaliufan Mountain. It became operational when the railway line opened in 1992. With a maximum elevation of 175 metres and length of 8,070 metres, is the longest mountain tunnel and highest point along the South-Link Line.
中文(臺灣):圖中顯示沿著軌道向中央隧道東口看去。中央隧道是在屏東縣獅子鄉與臺東縣達仁鄉之間一座穿越中央山脈的鐵路隧道,由南迴線從茶留凡山的底下通過。隨著南迴線於1992年開通,中央隧道也一同啟用。整座隧道最高點位於海拔175公尺,其長度8,070公尺,是南迴線最長的山岳隧道。
日期
來源
圖片提取流程
本檔案提取自另一個檔案
:​East portal of the Central Tunnel.jpg
原始檔案
作者 billy1125
這是一張修飾過的圖片,即本圖片是用軟體修改過後的版本。原版圖片來源:East portal of the Central Tunnel.jpg。修改者:Liji6085

授權條款

This image, originally posted to Flickr, was reviewed on 10 May 2016 by the administrator or reviewer Elisfkc, who confirmed that it was available on Flickr under the stated license on that date.
w:zh:創用CC
姓名標示
此檔案採用創用CC 姓名標示 2.0 通用版授權條款。
您可以自由:
  • 分享 – 複製、發佈和傳播本作品
  • 重新修改 – 創作演繹作品
惟需遵照下列條件:
  • 姓名標示 – 您必須指名出正確的製作者,和提供授權條款的連結,以及表示是否有對內容上做出變更。您可以用任何合理的方式來行動,但不得以任何方式表明授權條款是對您許可或是由您所使用。
註解
InfoField
該圖片含有註解:在維基媒體共享資源上查看註解

說明

添加單行說明來描述出檔案所代表的內容

在此檔案描寫的項目

描繪內容

創用CC姓名標示2.0通用版 繁體中文 (已轉換拼寫)

image/jpeg

檔案歷史

點選日期/時間以檢視該時間的檔案版本。

日期/時間縮⁠圖尺寸使用者備⁠註
目前2016年5月10日 (二) 17:37於 2016年5月10日 (二) 17:37 版本的縮圖832 × 572(184 KB)Liji6085User created page with UploadWizard

下列2個頁面有用到此檔案:

全域檔案使用狀況

以下其他 wiki 使用了這個檔案: