用戶:NACHOgao3/布宜諾斯艾利斯快速公交系統

布宜諾斯艾利斯快速公交
概要
所有者布宜諾斯艾利斯市政府
地區布宜諾斯艾利斯
交通類型巴士快速交通系統
路線5
車站113站(not including 25 de Mayo line)
日運量1 million (2015)[1]
網站Official website
營運
開始營運2011年5月31日
技術
系統長度50.5km
系統地圖
  • Center Map showing current lines and lines under construction.[N 1][N 2]

布宜諾斯艾利斯快速公交(西班牙語:Metrobús de Buenos Aires)是阿根廷布宜諾斯艾利斯一套公交車專用網絡,類似於快速公交系統,全長50.5公里。特點是鉸接客車與普通公交車一同運行。由於使用該系統的公交車沒有使用統一的標誌,於是保持先前的普通公交線路編號。[2]該系統全年365天,每日24小時運行,白天2至4分鐘一班,晚上10至15分鐘一班。[3]

歷史

編輯

快速公交網絡的第一部分於2011年5月向公眾開放,通過胡安·B·胡斯托大道西班牙語Avenida Juan B. Justo連接利涅爾斯英語Liniers巴勒莫,經過21站,全長12公里。[4][5]第二部分於2013年7月24日開放,沿着七月九日大道經過17個車站,全長3公里。[6]

The third segment of the network opened on 14 August 2013, and consists of 36 stops with a distance of 23公里(14英里). This segment runs through important arteries of the southern area of the city, bringing commuters back and forth from the southern (Constitución) rail terminal of the General Roca Railway to the city proper's borders (General Paz Avenue). In parts of this segment of the network (along Rabanal Avenue) the bus lines merge with the general traffic and return to the dedicated lane afterwards.

On 9 October 2013, the Government of the City announced plans for the extension of the network, which will have a total extension of 56公里(35英里). When the network is complete, it will have a total of 7 lines carrying an estimated 1.2 million passengers per day.[7]

The fourth line, Metrobus Cabildo, opened in June 2015 and connects Congreso de Tucumán (the terminus of Line D of the Buenos Aires Underground) with Vicente López in Greater Buenos Aires.[8] This segment was originally going to be covered by Line D in its extension to the borders of the city proper, however the creation of this Metrobus means the line's extension will be unlikely.[9]

An eighth line was announced in 2015 which would run from North to South in the West of the city, linking most of the East-West lines together. This line will most likely replace the planned Line I of the Buenos Aires Underground, while parts of the line will run underground and the buses that operate the line will be electric.[10]

胡安·B·胡斯托線

編輯

Template:Juan B. Justo (Metrobus)

 
Articulated bus at a Juan B. Justo Line station.

The Metrobus Juan B. Justo was the first to begin operations, opening in 2011 and running down the entire length of the Juan B. Justo Avenue.[4] It is 12公里(7.5英里) long, has 21 stations and carries 100,000 passengers per day with a frequency of one bus every 2 minutes.[11] It is estimated that the implementation of the Metrobus along the avenue has reduced bus journey times by 40%, while also providing combinations with lines B and D of the Buenos Aires Underground, as well as the Sarmiento and San Martín commuter rail lines.[11]

The same exclusive lane is utilised by emergency vehicles. The implementation of this Metrobus line was met with some criticism from shop owners along the avenue who could no longer receive deliveries during peak hours due to the lower number of lanes for regular traffic, something which has been remedied by having specific hours for deliveries.[12] The segment also resulted in a 30% increase in bus travel as a result of the faster travel times and increased frequencies of the services.[13]

七月九日線

編輯

Template:9 de Julio (Metrobus)

 

The Metrobus 9 de Julio is 3公里(1.9英里) long with 13 stations and runs down the 9 de Julio Avenue, taking roughly the same route as Line C of the Buenos Aires Underground.[14] It serves 11 bus lines and reduces bus travel time by 50% along the avenue.[14] The main objective of this line is to join together the city's two busiest railway stations: Retiro and Constitución and to serve the approximately 250,000 passengers per day which use buses along the avenue, with a journey time of 15 minutes instead of the 30 minutes a bus took before the line was built.[15]

The National Government on the time criticised the line for overlapping with Line C of the Underground,[16] however there is no evidence that passenger numbers on the line have declined. Similarly, during the construction of the line thereof were also harsh criticisms that many trees along the avenue would disappear, however the City has stated that after construction was completed, there were 550 more trees along the avenue than before construction began.[14][17] In May 2015, two new 90 metre and 230 metre tunnels on the southern end of the line were opened. These tunnels go to and from Constitución railway station and are designed to decrease surface traffic in the area around the station, as well as reducing journey times on the line.[18]

南線

編輯

Template:Sur (Metrobus)

 

The Metrobus Sur was inaugurated in 2013 and joins Constitución railway station to the south of the city, ending at Puente Noria at the limit between the city proper and Greater Buenos Aires.[19] The line has two branches, is 23公里(14英里) long and has 37 stations.[20] It connects with the PreMetro E2 at its General Salvio terminus, with Underground Line H at Inclán and Line C's Constitución terminus where it also connects to the General Roca Railway.

A further combination with Line H will be at Saenz once the line is extended there, and a larger transfer terminal was opened there in March 2015, where it will also connect with the Belgrano Sur commuter rail line.[21][22] The line is estimated to serve around 250,000 passengers per day, with its creation increasing ridership by 30% and reducing journey times by 15%.[23]

卡比爾多線

編輯

Template:Cabildo (Metrobus)

 
Bus at Deheza station.

The Metrobus Cabildo opened on 17 June 2015, serving as a feeder service to Line D of the underground at its Congreso de Tucumán terminus (where new entrances were built to accommodate the Metrobus line)[24] and making it the first Metrobus line to continue out of Buenos Aires into Greater Buenos Aires.[8][25] with a length of 2.1公里(1.3英里) with the intention to reduce congestion in the area with a great affluence of passengers boarding Line D, whilst creating a terminal at the limits of the city at General Paz Highway for passengers from suburbs in Northern Greater Buenos Aires, such as Olivos and Vicente López.[26]

This Metrobus line cost an estimated AR$ 265 million ARS to build and will benefit an estimated 200,000 people.[8][27] Having a feeder service to Line D is something which had been discussed for many years, and at one point this was going to be done using a Buenos Aires PreMetro service with a new PreMetro Line D1, however the Metrobus ultimately proved the most appealing to city planners.[9]

五月二十五日線

編輯
 
Central Metrobus lane on the 25 de Mayo expressway.
 
A bus on the Metrobus 25 de Mayo next to the Dellepiane tolls.

On 5 October 2015 the Metrobus 25 de Mayo was opened, being the first line to operate on an expressway. The line begins at the intersection of the Perito Moreno, Cámpora, Dellepiane and 25 de Mayo expressways and continues on across the 25 de Mayo before arriving in the vicinity of Constitución railway station and the Perito Moreno expressway where it provides access to the Avenida 9 de Julio, the Metrobus 9 de Julio and Line C and Line E of the Buenos Aires Underground to the north, and the Roca Line, General Roca Railway and Line C to the south. The 7.5公里(4.7英里) line is expected to transport some 120,000 passengers daily.[28]

The line has significantly different characteristics to the rest of the network, consisting of a single six-metre lane in the middle of the 25 de Mayo activated only during rush hour and shared with emergency vehicles. The space used for the Metrobus between regular traffic was already in existence and no extra space was taken from the 25 de Mayo expressway, which continues to have four lanes per side, however additional tunnels and access ramps had to be built to accommodate the Metrobus.[29] The lane is opened between 6 and 12 in the morning towards the city and then again between 3 and 9 in the evening with buses circulating away from the city centre.[30] The line is also the first to accommodate the long-distance buses entering and leaving the city to and from Western and Southern Argentina, and these are expected to make up the majority of traffic on the line, while journey times for both long distance and local buses using this line are to be reduced by 50%.[31]

Along with the Metrobus line, the construction of a second bus terminal to reduce the strain on the Retiro bus terminal (by an estimated 40%) is being constructed at the start of the Metrobus line, at the intersections of the Dellepiane and 25 de Mayo expressways, with the intention of reducing the quantity of long distance buses making their way into the centre of the city.[32] At the terminal, the Metrobus will connect with Line E of the Buenos Aires Underground at a proposed new station, while the terminal itself is expected to open in November.[33] Prior to the opening of the Metrobus line, a new complex interchange was constructed at the western point of the line, over where the terminal is to be located.[34]

畫廊

編輯

參見

編輯

參考

編輯
  1. ^ Ya funciona Metrobus AU 25 de Mayo, el primero en una autopista - Buenos Aires Ciudad, 6 October 2015.
  2. ^ Diputada K con fuertes críticas al Metrobús en la 9 de Julio. Seccion Politica. 2013-02-24. (原始內容存檔於2013-10-29) (西班牙語). 
  3. ^ ¿Por qué Metrobus?. (原始內容存檔於2012-02-15). 
  4. ^ 4.0 4.1 Macri inaugurates new Metrobus transport system. Buenos Aires Herald. (原始內容存檔於2011-06-03). 
  5. ^ El Metrobús ya une Palermo con Liniers. LA NACION. 2011-06-01 [2022-07-17] (西班牙語). 
  6. ^ Mauricio Macri inauguró el nuevo Metrobus en la 9 de Julio. LA NACION. 2013-07-24 [2022-07-17] (西班牙語). 
  7. ^ Más de un millón de personas se beneficiarán con la red de Metrobus - Buenos Aires Ciudad, 9 October 2013.
  8. ^ 8.0 8.1 8.2 Inaugurarían en junio el Metrobús Cabildo - EnElSubte, 6 May 2015.
  9. ^ 9.0 9.1 ¿Por qué la línea D no llega hasta Puente Saavedra? - EnElSubte, 25 June 2013.
  10. ^ Larreta oficializa la transformación de la línea I en Metrobús - EnElSubte, 15 April 2015.
  11. ^ 11.0 11.1 Metrobus Juan B. Justo
  12. ^ Comenzó a funcionar el Metrobús sobre avenida Juan B. Justo - La Nacion, 31 May 2011.
  13. ^ Metrobús: en Juan B. Justo lo usan 100 mil pasajeros por día - Clarin, 31 May 2013.
  14. ^ 14.0 14.1 14.2 Metrobus 9 de Julio - Buenos Aires Ciudad
  15. ^ El Metrobús llega a la 9 de Julio para unir Retiro y Constitución 互聯網檔案館存檔,存檔日期17 April 2016. - La Razon, 11 October 2012.
  16. ^ Diputada K con fuertes críticas al Metrobús en la 9 de Julio - Seccion Politica, 24 February 2013.
  17. ^ Denuncian que las obras del Metrobús destruyen el paisaje de la 9 de julio - La Politica Online, 8 February 2013.
  18. ^ Once líneas de colectivos ya utilizan los nuevos túneles del Metrobus - Clarin, 30 May 2015.
  19. ^ El Metrobus llega al sur de la Ciudad: abren hoy el ramal más largo - Clarin, 14 August 2013.
  20. ^ Metrobus Sur - Buenos Aires Ciudad
  21. ^ Metrobus Sur: desmantelan dos estaciones para construir un centro de transbordo - La Nacion, 24 October 2014.
  22. ^ Inauguraron el nuevo centro de transbordo Sáenz - EnElSubte, 19 March 2015.
  23. ^ Metrobus Sur - Buenos Aires Ciudad
  24. ^ Nuevo Centro de Transbordo Congreso de Tucumán - Buenos Aires Ciudad, 17 June 2015.
  25. ^ Mauricio Macri inauguró el Metrobus Norte, que une Vicente López con Belgrano - La Nacion, 17 June 2015.
  26. ^ Macri apura el Metrobus de Cabildo para inaugurarlo antes de las primarias porteñas - La Politica Online, 22 December 2014.
  27. ^ Apuran obra de cocheras de la línea D por el Metrobus Cabildo - EnElsubte, 23 June 2014.
  28. ^ Inauguraron el Metrobus en la autopista 25 de Mayo - InfoBAE, 5 October 2015.
  29. ^ Metrobus 25 de Mayo - Buenos Aires Ciudad
  30. ^ El Metrobus ya corre por la autopista 25 de Mayo - La Nacion, 6 October 2015.
  31. ^ Metrobus 25 de Mayo: funciona desde ayer y es el primero en una autopista porteña - Clarin, 6 October 2015.
  32. ^ La Ciudad construye en el sur la nueva Terminal de Ómnibus Dellepiane - Buenos Aires Ciudad, 1 October 2015.
  33. ^ En el sur porteño, otra estación de ómnibus para el mismo empresario - Clarin, 2 October 2015.
  34. ^ Habilitaron el distribuidor Dellepiane: une cuatro autopistas - Clarin, 19 June 2015.
  1. ^ As of October 2015, The 25 de Mayo, 9 de Julio, Cabildo, Juan B. Justo and Sur lines are complete.
  2. ^ Some lines such as Metrobus Cabildo continue outside the limits of the city proper but are only shown up to the limits on this map.

Template:Buenos Aires Transit